Here is what stillsmokin and me have been workin on this week. Jeff designed it and I have done about 90% of the welding on it and it is not finished yet, it will eventually have another bar coming off the center of the truck and tying in to the "Reese" hitch. It will technicly have a removable drawbar.
This was tonights project, I put about 5 hour into this welding it up. Lotso passes. I put about 15 passes on where the 2" bar stock meets the hitch channel because of the deep bevel I put on there. That was done with a 6011 root and 7018 cover passes. On the gussets I put down 6 passes on the out side all done with 7018.
Before Gussets
After gussets